Case Studies

Sumburgh Airport - Runway 0927 Extension, Shetland

Subcontract for runway extension, 72,000T Armour imported by barge from Norway. 400,000m3 fill won from onsite borrow pit. Concrete perimeter wall, Ducting and Drainage. Including nightshift working. Crushing of aggregate for BBA surfacing and construction of car park.

Read more

Sumburgh Airport – Runway 1533 Refurbishment, Shetland

Main contractors to carry out planing of existing secondary 15-33 runway surfacing and paving on planed surface using Asphalt, lining the entire runway as well as AGL works. Night shift working

Read more

Tingwall Water Main Renewal, Shetland

Installation of 13,000m of new opencut water main from 90mm up to180mm diameter pipe from Scalloway to Califf, Gott including air valves, sluice valves, scour valves and meters.

Read more

Gremista Landfill Phase 2, Shetland

Working as sub contractor our works included excavation of all peat, superficial overburden and rock to achieve formation levels

Read more

Hamnavoe Marina, Shetland

Construction of new marina in Hamnavoe, Burra including import and placing of 50,000T of rock for breakwater, car parking, manholes, concrete and associated works.

Read more

Bressay Sports Field, Shetland

Construction of new sports field in Bressay including mass excavation, filling and drainage works.

Read more

Millenium wind farm Phase 1

Crushing and Processing rock for roads and concrete aggregates for turbine bases

Read more

Fortwilliam to Mallaig Road Improvements

Crushing and Processing Rock for road materials, drainage and sub base

Read more

Kilbruar Wind farm Golspie phase 1

Crushing and Processing Rock for roads and Concrete Aggregates for turbine bases

Read more

Ben Akitel Wind Farm Isle of Skye 1

Crushing and Processing Road materials

Read more

Fair burn Wind farm Inverness shire

Crushing and Process Rock for roads and Concrete aggregates

Read more

Quoys Housing Development, Lerwick, Shetland Phases 1-3

Main contractors for the phase 1 construction of main roads, surface and foul water, steel reinforced concrete bridge and associated works. Phase 2&3 sub contractors to do similar works.

Read more

Hillside Housing Development, Gulberwick, Shetland Phases 1-3

Construction of 3 phases of housing for for Hjaltland.

Read more

Hestingott – Sea Outfall Extension

Demolition of existing septic tank. Installation of new septic tank and associated manholes

Read more

Blacksness Pier Sewer Renewal, Shetland

Replacement of existing sewer and installation of new sewer on the pier at blacksness, Scalloway. Including manholes up to depths of 4m. Most of this work was tidal.

Read more

Maa Ness Septic Tanks, Shetland

Installation of four 200,000L septic tanks at Maa-Ness, Scalloway contract including a new 180mm dia rising sewer main, manholes and outfall pipework.

Read more

Demolition of Lerwick Fire Station

This project involved the demolition of a disused fire station in an urban environment

Read more

Sletts Sea Wall, Shetland

Construction of new sea defence wall at Sletts Road in Lerwick, including 400m³ of concrete and armour stone installation.

Read more

Demolition of Esplanade Toilets, Shetland

Demolition of the public toilets on the waterfront in Lerwick.

Read more

Gilbert Bain Hospital Car Park Extension, Shetland

Construction of a new car park including retaining walls and white lining.

Read more

Aberdeen Beach Rockworks

Construction of new groynes on Aberdeen beach to prevent erosion.

Read more

Castleview Coatbridge

This project involved the development of a disused industrial site for housing with the main elements comprising of earthworks re-profiling, ground remediation and sustainable drainage installation

Read more

Inverness Airport North Apron Works

Upgrading of North Apron of Inverness Airport.

Read more

Lerwick Harbour North Harbour Dredging

Plant Hire, Haulage and Onshore works on dredging contract

Read more

Lingerton Landfill, Lochgilphead

Subcontract and Plant Hire creating new cells in existing landfill site

Read more

Loch Awe Forestry Roads, Argyll

Building of 12km of low cost roads to enable forestry harvesting.

Read more

Oban Airport

Works included the refurbishment of existing runway to meet CAA standards.

Read more

Stranraer Harbour

Works included the demolition of existing timber pier structure and installation of new bracing system

Read more

Sumburgh Airport - Runway 1533 AGL Upgrade

Replacement of Aeronautical Ground Lighting on runway. Airside working, including concrete and DBM/Asphalt laying. Including nightshift working.

Read more

Toft, Ulsta and Fetlar Ferry Terminals

Subcontract works for earthworks, armour stone placement, surfacing and white lining

Read more

Westercraigs Development, Inverness

This project involved the development of a disused hospital for housing with the main elements comprising of earthworks re-profiling and ground remediation

Read more
Mailing List

Sign up to our mailing list to receive updates and news from MK Leslie.

Latest news

View all news